The Transportation Agency for Monterey County is the responsible agency for implementing two anticipated regional projects on the State Highway System, for which Caltrans is designated as the lead agency and will prepare designs for roundabouts that are being considered or are approved in each project.
The SR 156 / Castroville Boulevard Interchange Project has already received environmental clearance and approval by Caltrans. The project includes three roundabouts in its design, one for eastbound ramp intersection, one for the westbound ramp intersection, and one for the new Castroville Boulevard alignment intersection with the old Castroville Boulevard.
The SR 68 Scenic Corridor Project study proposes nine roundabouts included in the preferred alternative, which would replace the existing traffic signals along the corridor from Salinas to Monterey. This project is currently undergoing preliminary engineering and environmental review. Both projects will be designed by Caltrans. The consultant selected to perform roundabout design peer reviews is anticipated to conduct independent design review for all twelve roundabout included in these two projects at key points throughout the environmental review and design process.
The proposed schedule for the Request for Proposals is as follows:
Date/ Timeframe
Task
October 25, 2018
Distribute RFP
November 15, 2018
Deadline for requests for clarification or exceptions
November 29, 2018
Proposals due
December 13, 2018
Review and rank proposals
December 19, 2018
Interviews (if necessary)
January 8, 2019 Select top ranked consultant, negotiate contract
January 23, 2019
Present consultant contract to TAMC Board for approval
Attached is the draft scope of work for this RFP.